久久亚洲精品国产精品777777-久久亚洲精品国产亚洲老地址-久久亚洲精品玖玖玖玖-久久亚洲精品人成综合网-亚洲视频免费在线播放-亚洲视频免费在线观看

您好,歡迎來到中國企業庫   [請登陸]  [免費注冊]
小程序  
APP  
微信公眾號  
手機版  
 [ 免責聲明 ]     [ 舉報 ]
客服電話:13631151688
企業庫首頁>資訊
行業
超級獵聘人才網 廣告

Specific operation process and management of coating line

作者:Zhongshan Mingbang Industrial Equipment Co., Ltd 來源:zsmingbangen 發布時間:2021-12-13 瀏覽:513
Specific operation process and management of coating line

1. Coating line refers to a production line that goes through the following series of operations

Ii. The specific operation process is as follows:

1, into the product: put the coating on the plug-in to start work

2, electrostatic dust removal: the injection of oil, dust removal

3, preheat: in order to better color to be coated with a little temperature

4, primer spraying: the color of the plastic itself covered, color for production requirements of the first background color spraying

5, drying: through the temperature of IR area in the tunnel, semi-dry state, for the next spraying preparation

6, surface spraying: spray the color required

7. Smooth and dry: smooth and dry through the tunnel

8, UV spraying curing: and UV coating with UV365nm light coating requirements of the amount of light (800~ 1200MJ) instant curing

9. Deliver goods and check the packaging

Coating line process is divided into: pretreatment, dusting coating, heating curing. To manage this process, note the following:

(1) Production management of pre-treatment section of coating line

Pre - treatment manual simple process and automatic pre - treatment process, the latter is divided into automatic spray and automatic dip spray two processes. The workpiece must be surface treated to remove oil and rust before spraying. In this section used more liquid, mainly rust remover, degreasing agent, table adjustment, phosphating agent and so on.

In the processing section or workshop before painting production line, the first thing to pay attention to is to formulate the necessary purchase, transportation, storage and use system of strong acid and alkali, provide workers with necessary protective clothing, secure quan and reliable dressing, handling, configuration of appliances, and formulate emergency treatment measures and rescue methods in case of accidents. Secondly, in the pretreatment section of painting production line, due to the existence of a certain amount of waste gas, waste liquid and other three waste substances, so in terms of environmental protection measures, it is necessary to configure air exhaust, liquid discharge and three waste treatment devices.

The quality of the pre-treated workpiece should be different due to the different pretreatment solution and coating production line process. Better processing of the workpiece, surface oil, rust to do, in order to prevent a short period of time to rust again, generally should be in the pretreatment after several processes, phosphating or passivation treatment: before spraying powder, also should have phosphating workpiece for drying, to its surface moisture. Small batch single production, generally using natural air drying, sun drying, air drying. And for large quantities of flow work, generally take low temperature drying, using oven or drying road.

(2) spraying powder coating organization production

For small batch workpiece, manual dusting device is generally adopted, and for large batch workpiece, manual or automatic dusting device is generally used. Whether manual or automatic dusting, quality control is very important. To ensure that the spraying workpiece powder uniform, consistent thickness, to prevent thin spray, leakage spray, wipe off and other defects.

Coating production line in the process, but also should pay attention to the hook part of workpiece, before entering the curing, should adhere to its powder as far as possible will blow out, prevent excess powder curing of hook, some for curing remove residual powder before difficulties, should be timely stripping hook has solidified powder film, conductive to ensure the hook is good, and the number of artifacts to the powder.

(3) Production management of curing process in coating line

This process should pay attention to: sprayed workpiece, if it is a small batch of single production, into the curing furnace before paying attention to prevent falling powder, such as powder rubbing phenomenon, should be timely spray powder. When baking, strict process and temperature, time control, pay attention to prevent color difference, over baking or too short time caused by insufficient curing.

For large quantities of automatic delivery of the workpiece, in the drying road before also carefully check whether leakage spray, spray thin or local powder phenomenon, such as found unqualified parts, should be closed to prevent entering the drying road, as far as possible to take down the spray. If individual workpiece is not qualified due to thin spray, it can be re-sprayed and solidified again after curing.

鄭重聲明:資訊 【Specific operation process and management of coating line】由 Zhongshan Mingbang Industrial Equipment Co., Ltd 發布,版權歸原作者及其所在單位,其原創性以及文中陳述文字和內容未經(企業庫www.zgmflm.cn)證實,請讀者僅作參考,并請自行核實相關內容。若本文有侵犯到您的版權, 請你提供相關證明及申請并與我們聯系(qiyeku # qq.com)或【在線投訴】,我們審核后將會盡快處理。
會員咨詢QQ群:902340051 入群驗證:企業庫會員咨詢.
免費注冊只需30秒,立刻尊享
免費開通旗艦型網絡商鋪
免費發布無限量供求信息
每天查看30萬求購信息